Operator · Neuquén
Patagonia Energy
It produced 174 kBOE in 2025 in Neuquén (0.0% of the provincial total) with 78 reported wells. With 7 months of 2026 reported, its annualized production would be 74 kBOE. Under Res. 258/2025 it is a small operator.
Obligations
What it must file and when.
Timeline from procedure IF-2026-00937453 applied to the small segment. Filing status will be completed once the province shares the reports it receives.
| Inventory | Minimum level | Verification | LDAR | Due | Filed |
|---|---|---|---|---|---|
| 2025 | Own methodology | no | not applicable | Overdue · 2026-09-30 | No official data |
| 2026 | Own methodology + Scope 2 | no | not applicable | Next · 2027-09-30 | No official data |
| 2027 | Level 2 at 100% + Scope 2 | no | to be defined | Upcoming · 2028-09-30 | No official data |
| 2028 | Level 2 at 100% + Scope 2 | no | to be defined | Upcoming · 2029-09-30 | No official data |
| 2029 | Level 3 at 50% + Scope 2 | to be defined | to be defined | Upcoming · 2030-09-30 | No official data |
| 2030 | Level 3 at 75% + Scope 2 | to be defined | to be defined | Upcoming · 2031-09-30 | No official data |
Territory
1 operated concessions and what satellites detected within them.
Highlighted areas are those Neuquén registers under this operator. Detections are shown within those areas without attributing them as the company’s own measurement.
- AGUADA DEL CHIVATO-AGUADA BOCAREY · exploitation concession · 110 km²
Production: Production: datos.energia.gob.ar, Chapter IV, well-level production, Neuquén province (CC BY 4.0). Rules: Res. 258/2025, Disp. 1/26, IF-2026-00937453. Venting: SESCO, National Energy Secretariat, gas balance, vented gas, Neuquén province (thousand m³). Flares: World Bank, Global Flaring and Methane Reduction Partnership (VIIRS), Vaca Muerta sites. Reported venting in the last 12 months: 75 thousand m³.
